Dynamic Animatronic Vehicular Entity

(AKA: Cyber-Dave)

Intro The Team Diary2004 Diary2005 Diary2006 Diary2007 Downloads Contacts/Links
     

Early arm test (Feb 2004)

There are two clips of the trial run of our prototype arm, in two different formats. 

6 second Real file 599kb
6 second mpg file 980kb

14 second Real file 1.03mb
14 second mpg file 2.36mb

Arm wiring test (Mar 2006)

A short video of the first arm wiring test, working out the best route around the joints. 

7 second mpg file 2.35mb

Prototype hand (Apr 2006)

Showing the cardboard model of our hand driven by the glove controller. 

9 second mpg file 3.07mb

Another arm demo (Dec 2006)

A bit of fun at the office party!  Well, if you've got it, why not use it? 

30 second mpg file 26.9mb

 

(Real Player is available from www.real.com)

 

   
     

 All text and images © the DAVE project team 2004